Bridges

Bridges
ACTIVITIES
  • Field investigation & surveys.
  • Alignment options study.
  • Techno-economic feasibility study.
  • Detail design.
  • Preconstruction activities.
  • Preparation of detail project report.
  • Construction Supervision & project management.
bridge
DPR Projects
Completed
  • 4-Lane elevated corridor of 9km at Lucknow-Kanpur section of NH-25, Lucknow-Rai Brailey section of NH-24B & Lucknow-Sitapur section of NH-24.
  • 6-Lane Flyover of 7450m with Span varies from 40m to 130m with span type, PSC, Segmental, Bowstring and steel truss Bridges on Kalindi Bypass in Delhi.
  • 4-Lane Flyover of length 900m with span varies from 23m to 50m & 11 Nos. of Major Bridge of length varying from 62.0m to 520.0m with varying span of 42m to 150m of PSC, Bowstring & Steel Arch of Pathankot – Mandi Section of NH-154 Hill Section.
  • 2-Laning of Mandla Chilpi section of NH-12A (189km).
  • 6-lane Hindon Elevated road having length 6127m with major Span of 120m Steel truss.
  • 6-lane Major Bridge of 1668m with long span of 116m inBalance Cantilever Ghazipur-Saiyad Reza Section of NH-24.
Ongoing
  • 3-Lane Rail cum road double decker viaduct as an approach of Ganga Bridge at Ghazipur on NH-24 (1900m).
  • 3-lane bridge over river Brahmaputra in Bangladesh (15000m) approx..
PMC & Supervision Projects
Completed
  • 4-Lane ROB cum viaduct at km 106 near Solan on NH-05 (1210m) Hill SectionHill Section.
  • 4-Lane major bridge at Km 226+150 of 842m in the section of Pandoh-Takoli on NH-21 in Himachal PradeshHill Section.
  • 4-Lane major bridge at Km 220+640 of 105m in the section of Pandoh-Takoli on NH-21 in Himachal Pradesh.Hill Section.
  • 4-Lane major bridge at Km 233+698 of 82.5m in the section of Pandoh-Takoli on NH-21 in Himachal Pradesh. Hill Section.
  • 4-Lane ROB at Loharu, Pali, Jhajjar, Pinjore and other various locations in Haryana.
  • 2-Lane ROB at Siwani, Ambala, Kaithal and other various locations in Haryana.
Ongoing
  • PMC of major bridge & viaduct of length 3200m with long span of 120m extra dosed on River Ganga at Mirzapur
  • 6-Lane elevated road of 4790m from RTO Chowk to University at Nagpur Hill Road.
  • 6-Lane Major bridge of 6000m with long span of 180m extradosed on river Ganga at Sahabganj, Jharkhand.
  • PMC of major bridge & viaduct of length 3200m with long span of 120m extradosed on River Ganga at MirzapurHill Road.
  • 6-Lane Bridge with approaches from Km 8.480 near Sherpur to Km 23.000 near Dighwara across River Ganga as Part of Patna Ring Road in Bihar.